CSI Store Foundation
The majority of construction projects include a requirement for delegated design of glazing systems in the specifications. These types of projects lack front-end design input from facade structural engineers and have limited manufacturer input leaving engineering design to the tail end of the construction. This delegated design process has significant problems leaving potential holes in the building envelope and significant risks of liability. The glazing industry has rapidly evolved with advanced manufactured systems, but the design process has left gaps open. Discover the major issue overlooked associated with delegated design which accounts for an estimated 90% of all facade envelope damage and leakage 1-5 years after the construction is completed. The course wraps up with solutions to “Close the hole in the Envelope” and fix the delegated design process. Learning Units will be provided (AIA LU) and anyone may attend free of charge.
Specifier MagazineConduct PolicyTerms & ConditionsReturn & Refund PolicySitemap © 2026 Construction Specifications Institute