CCCA Domain

CCCA Knowledge Domains


Domain 1: Project Records (23%)
  1A.      Identify the documents that are part of the contract.
  1B.      Verify preconstruction submittals have been received and reviewed.
  1C.     Advise team members on the proper use of contractual forms.
  1D.     Organize and maintain complete project documentation.
  1E.      Implement and maintain logs for recording documentation.
  1F.      Evaluate project schedules for contract compliance.
  1G.     Identify the scope of alternates and implications on other work.
  1H.     Identify project performance measurement and cost adjustments.
   
Domain 2: Project Initiation (14%)
  2A.      Participate in the bidding process.
  2B.      Identify the owner’s bidding requirements.
  2C.      Participate in the constructability review of project design.
  2D.      Review schedules for omissions, conflicts, and unrealistic timeframes.
  2E.      Ensure that bid addenda, accepted alternates, and negotiations are incorporated into the project scope of work.
  2F.      Provide guidance on contract administration policies and procedures.
  2G.     Communicate with the contracting parties during the construction process.
  2H.      Understand relationships, roles, and responsibilities of the project team related to subcontracts and subcontractors. 
   
Domain 3: Quality Assurance and Quality Control (23%)
  3A.      Identify and report contract document discrepancies with recommended action.
  3B.      Confer with project team to discuss and resolve project issues. 
  3C.     Provide feedback on interpretations of contract documents.
  3D.     Follow up on progress reports.
  3E.      Review the contractor's schedule of values.
  3F.      Process the contractor's applications for progress payments.
  3G.     Ensure testing required by the contract is conducted.
  3H.     Organize contract modification documentation.
  3I.      Process action and information submittals (e.g., shop drawings, product data, samples). 
  3J.       Process requests for substitutions and “or equal” items. 
  3K.      Administer product substitution requests. 
  3L.       Review and maintain informational and action submittals.
  3M.     Evaluate systems and products compliance with contract documents. 
  3N.     Verify test reports indicate compliance with code and contract requirements.
  3O.     Review contractor's compliance to closeout procedures and submittals including warranty documentation, maintenance, and operation.
  3P.      Verify preconstruction submittals have been received and reviewed.
  3Q.     Evaluate the project document submissions to determine if the contract requirements are being met.
   
Domain 4: Site Visits and Observations (11%)
  4A.      Participate in project meetings as required in the contract documents.
  4B.      Participate in preconstruction conference.
  4C.      Make periodic visits to the site during construction and observe the quality and progress of the work.
  4D.      Identify onsite design issues and engage project team to formulate solutions.
  4E.      Document field conditions and determine if conditions differ from the provided reference documents.
   
Domain 5: Claims and Disputes (14%)
  5A.      Identify construction issues and procedures for resolving them.
  5B.      Interpret contract documents for compliance.
  5C.     Notify parties of non-conforming work.
  5D.     Review and determine legitimacy of a claim.
  5E.      Review and process proposed changes for effect on cost, time, and quality.
  5F.      Participate in the development of revisions, changes, additions, and deletions, related to the enforcement of the construction contract.
  5G.     Follow procedures for change order requests.
  5H.     Evaluate change order requests.
  5I.      Process extra design service requests.
  5J.      Evaluate the effect of non-conforming work.
  5K.     Participate in dispute resolution measures. 
Domain 6: Project Closeout (15%)
  6A.     Review and confirm closeout procedures and requirements (e.g., warranty documentation, maintenance, operation).
  6B.     Determine when project reaches substantial completion.
  6C.     Identify non-conforming work.
  6D.    Conduct the substantial completion inspection.
  6E.     Coordinate final inspection of the project.
  6F.      Issue the Certificate of Substantial Completion.
  6G.     Obtain from contractor the required contract closeout documents (e.g., lien waivers, affidavits of payment, consent of surety, sustainable design closeout documents, warranty certificates).
  6H.     Coordinate record documents submittal.
  6I.      Coordinate project team’s sign-off.